Impact window replacement: permits and timeline in South Florida

By the Starglazing team · Florida Certified General Contractor CGC1535992 · Updated 2026-11-16
Yes, replacing windows and doors needs a building permit in Miami-Dade, Broward and Palm Beach. The contractor submits the product approvals (NOA or FL number) and a window and door schedule, then the city or county inspects the installation. From signed contract to finished job, most South Florida projects take about 2 to 4 months, mostly waiting for custom-made impact units; installing a typical house takes only a few days.

Who needs a permit

Miami-Dade: a permit is required to replace a window or a door with its frame. Replacing only the glass, or only an exterior door slab, is exempt. Unincorporated areas are permitted by the county; the 34 cities run their own building departments.

Broward: a permit is required. Every jurisdiction uses the Broward County Uniform Retrofit Window & Door Schedule.

Palm Beach: a permit is required. The county asks for product approval details and a layout of the openings with sizes and the bedroom egress windows marked.

Condo buildings over 3 stories or 50 ft are "threshold buildings" in Miami-Dade, with extra engineering and a special inspector. Condo associations and HOAs usually need their own approval before the permit, too.

What gets submitted

The steps and how long each takes

StepTypical time
Free site visit and field measurements1 visit, about an hour
Proposal, online signing and 50% deposita few days
HOA or condo approval (if any)1–4 weeks
Permit review1–4 weeks
Manufacturing of custom impact unitsabout 6–12 weeks
Installation, typical house2–5 days
Final inspectiona few days after install

We order your windows and doors once the permit is approved, so manufacturing follows permit review. Manufacturer lead times vary by brand and season and can stretch after a major storm; we confirm the current lead time on your proposal. Florida law (s. 553.792) gives local governments up to 30 business days to act on a complete residential permit application.

What installation day looks like

The crew removes one opening at a time so your home is never left open overnight, sets each new unit with the anchors the approval requires, seals it, and patches the stucco and interior returns. Expect some dust and noise. Please clear a workable area around each opening (furniture, curtains, valuables) before we arrive; we cover the floor around the opening we are working on.

Inspections and closing the permit

The building department inspects the installation (anchoring and sealing) and does a final inspection. Keep the closed permit with your NOAs: insurers, wind-mitigation inspectors and future buyers ask for it, and an open permit can hold up a sale.

Price your own project in 2 minutes.Pick your windows and doors, see an installed estimate with permit, then book a free site visit.
Get free estimate

Frequently asked questions

Do I need a permit to replace windows in Florida?

In Miami-Dade, Broward and Palm Beach, yes: replacing a window or a door with its frame requires a building permit. Your licensed contractor pulls it and arranges the inspections.

How long does impact window installation take?

A typical house takes 2 to 5 days on site. The whole project usually takes about 2 to 4 months from contract, mostly waiting for the custom impact units to be made.

How long does a window permit take in Miami-Dade?

Often 1 to 4 weeks depending on the city and how complete the submittal is. Florida law gives local governments up to 30 business days to act on a complete residential application.

Can I replace windows without a permit?

Not legally, except glass-only or door-slab-only replacements in Miami-Dade. Unpermitted work can cause trouble with insurance, wind-mitigation credits and selling the home.

Does my condo or HOA need to approve impact windows?

Usually yes. Most associations require approval of the product, color and glass before the permit. Ask your association for its window specification early.