Impact windows and doors in Jupiter
Wind and product rules
Jupiter is in Palm Beach County, which is outside the High Velocity Hurricane Zone but entirely within the wind-borne debris region, so every opening still needs impact-rated glass or approved impact protection. A statewide Florida Product Approval is enough here; a Miami-Dade NOA is accepted but not required (see NOA and HVHZ explained). Palm Beach County's wind-speed map puts areas east of the 160 mph line, including Jupiter, at 170 mph for standard homes.
Permits in the Town of Jupiter
The Town of Jupiter Building Department requires a permit to replace even one window or door. Its window and door replacement checklist asks for:
- A floor plan marked "like for like," with bedroom egress windows identified.
- A window and door schedule plus the Town's Wind Design Pressure Chart, marking each opening's design pressure, mean roof height, exposure and wall zone (or engineer or architect calculations instead).
- The Florida Product Approval or NOA, stamped, with the exact product marked, kept on site for all inspections.
If an opening changes size or location, a separate alteration permit is required. Addresses in Jupiter Farms and other unincorporated areas are permitted by Palm Beach County rather than the Town; we confirm which applies.
Historic sites and HOAs
The Town's Historic Resources Board approves changes to the few locally designated historic properties, with the proportion of openings as one of its review standards. Far more common are golf and gated HOA communities with architectural rules for frames, tint and grids.
Jupiter homes
Jupiter grew mostly in the 1980s and 1990s: Census data puts the median year built at 1989, with about 70% of homes built before 2000. Many of those homes still have their original windows and shutters.
Condos and townhomes
Florida law requires every condo association to adopt hurricane-protection specifications, and the board may not refuse an owner's installation that meets them (s. 718.113). Ask your association for its window specification before ordering. Buildings with three or more habitable stories also go through milestone structural inspections starting at 30 years (s. 553.899), and their reserve studies must cover windows and exterior doors.
How a Starglazing job works in Jupiter
- Instant estimate online, then a free site visit (about an hour) to measure every opening.
- Written proposal with products, approvals and permit, signed online.
- Approvals and permit: Town of Jupiter permit through JCDS (or Palm Beach County if unincorporated), with the wind design pressure chart; HOA approval where required.
- Manufacturing of the custom impact units once the permit is approved, usually about 6–12 weeks.
- Installation by our own crews, usually a few days on site, depending on the number of openings in your home or condo unit; please clear a workable area around each opening, and we cover the floor where we work.
- Inspections and closed permit, which you keep for insurance and resale.
Most projects take about 2–4 months from contract to finish (see permits and timeline).
Frequently asked questions
Do I need a permit to replace one window in Jupiter?
Yes. The Town of Jupiter requires a permit even for a single window or door replacement.
What does the Town of Jupiter require for a window permit?
A like-for-like floor plan with egress windows marked, a window and door schedule with the Town's wind design pressure chart (or engineered calculations), and the stamped product approval, which must be on site for inspections.
What design wind speed applies in Jupiter?
Palm Beach County's wind-speed map puts Jupiter at 170 mph for standard homes. Jupiter is outside the HVHZ, so a Florida Product Approval is enough.
Guides
Nearby areas
Sources
- Town of Jupiter: windows and doors replacement checklist
- Town of Jupiter FAQ: permits
- Town of Jupiter: online permitting
- Palm Beach County wind speed maps (Risk Category II)
- Florida Statutes s. 718.113, condo hurricane protection specifications
- U.S. Census Bureau, ACS 2020–2024 (year structure built), via Census Reporter